[rank_math_breadcrumb]
IMG-20190416-WA0007

Leveled ground

The plot intended for the construction of the new school was a stepped mountain slope. A group of men from the village worked with a large bulldozer for a week to level the ground. The bulldozer was working nearby and could be rented for a reasonable price. A beautiful flat piece of land has been created with great craftsmanship. Large chunks of stone up to 1.5 meters have been moved and reused where possible.

grond_school_Sailung_voor_egalisatie
School_area_Sailung_Nepal

Share this post

Share on print
Share on email
en_US